Worcestershire County Council have opened the Crookbarrow Way Footbridge ramps on an interim basis pending completion of the permanent balustrade fencing when the sub-contractors emerge from lockdown. Please note that the interim measures:
- require cyclists to dismount
- do not include the opening of the “shortcut” steps (as there is no handrail)
- do not include the link to the bridleway (which is easily bypassed by use of the cycleway)