Crookbarrow Way Footbridge Opened

Worcestershire County Council have opened the Crookbarrow Way Footbridge ramps on an interim basis pending completion of the permanent balustrade fencing when the sub-contractors emerge from lockdown. Please note that the interim measures:

  • require cyclists to dismount
  • do not include the opening of the “shortcut” steps (as there is no handrail)
  • do not include the link to the bridleway (which is easily bypassed by use of the cycleway)

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.